Task planning consultants in the implementation of the construction project are:
- Field conditions make adjustments to the wishes of the building owner.
- Make working drawings execution.
- Make a work plan and requirements - implementation requirements of the building (RKS) as guidance.
- Make a budget plan of the building.
- Projecting the desire - a desire or an idea - the idea owner into the building design.
- Make design changes in case of deviation execution of work in the field that does not allow the design manifest in embodied.
- Accountable for the design and calculation of the structure in case of failure of construction.
Authorized consultant planner is:
Keep the design in terms of their parties - the executor of the building which does not carry out the work according to plan.
Tidak ada komentar:
Posting Komentar